Packaged Cooling towers > Intel IDC2
Year: 2009
Construction: Hand laid FRP
Water Flow: 1,400 m3/hr
Intel had to replace old 2000 TR tower which was corroded by the salty air from the Mediterranean. Modular hand-laid FRP towers were designed to fit the exact space on the roof. Replacement took place in two days' work.
Industry: Semi-conductors
|
|
|
|