About YWCT Products      Projects    Partners Customers Contact us Home
  Projects

   Projects
   
Factory-made cooling towers:
Intel IDC2
Intel IDC9
Danieli Engineering
Amraz SRL
Siemens Water Technology
Mekorot Neve Zohar
Mekorot Desalination Plant
Ludan Engineering
Gezer power plant Israel Electric Corporation (IEC)

Field-assembled cooling towers:
Rotem Amfert Negev Plant
Carmel Olefins
ORL Refineries
Azriely Center
Ben-Gurion International Airport
Tower Semi-Conductor
Shalom Tower
Nesher Power Plant
Makhteshim Chemical Works
Bateman Engineering
Maxima air separation center
 

Field-assembled cooling towers > Carmel Olefins

Year: 2006
Construction Material: Cement, Concrete
Water Flow: 7,500 m3/hr
AAs part of Carmel Olefin's expansion, YWCT was asked to increase the cooling capacity of both its ethylene and polyethylene plants. A three-cell structure measuring 12m X 12m per cell was designed for the former, and a two-cell measuring 12m X 12m per cell was designed for the latter.
Industry: Oil refinery



cooling towers