Field-assembled cooling towers > ORL Refineries
Year: 2006
Construction Material: Cement,
Concrete
Water Flow: 8,000 m3/hr
The task was to replace a 70-year-old atmospheric cooling tower with a new, more efficient tower. A two-cell 14m X 14m tower was designed. As part of its deliverables, YWCT provided the refineries with a scale drawing of the concrete cement structure, and detailed drawings of the relevant piping.
Industry: Petroleum refining
|
|
|
|