|
Hifa Oil Refinery |
|
Year: 2006 Construction Material: Cement, Concrete Water Flow: 8,000 m³/hr The task was to replace a 70-year-old atmospheric cooling tower with a new, more efficient tower. A two-cell 14m X 14m tower was designed. As part of its deliverables, YWCT provided the refineries with a scale drawing of the concrete cement structure, and detailed drawings of the relevant piping. Industry: Petroleum refining |
 |
|

| |
|
|
|
|