Field-assembled cooling towers > Azriely Center
Year: 2002
Construction Material: Cement,
Concrete
Water Flow: 1,500 m3/hr
In order to overcome an air circulation problem, YWCT designed a round concrete cement structure containing 24 centrifugal fan units that force the air outward.
Industry: HVAC
|
|
|
|