Year: 2000 Construction Material: FRP and HDG Water Flow: 3,600 m³/hr In 1999, YWCT was asked to plan and build a cooling tower for the new terminal at Ben-Gurion Airport (TLV). A concrete basin elevated from the ground was designed. The basin's height increased the efficiency of the pumps; and the space under the basin is utilized for storage. An HDG structure covered with pultruded FRP was erected over the basin Industry: HVAC