Field-assembled cooling towers > Nesher Power Plant
Year: 2008
Construction: Pultruded FRP
Water Flow: 2,000 m3/hr
Nesher is one of Israel's largest cement manufacturers. Its power plant required a heavy-duty cooling tower due to conditions at Nesher's site, which is full of corrosive dust. A dual-cell pultruded FRP tower over a concrete basin was designed and built.
Industry: Power generation
|
|
|
|