Field-assembled cooling towers > Bateman Engineering
Year: 2001
Construction: HDG
Water Flow: 2,400 m3/hr
YWCT was asked by Bateman Engineering to design and manufacture a cooling tower for a large gas pumps project in Turkmenistan. YWCT provided the scale drawings of the concrete basin and the piping accessories. A four-cell HDG tower was designed and built at YWCT's facility in Ashkelon. The tower was dismantled and shipped to the job site, where a YWCT team was sent to re-erect it. In three weeks' time, the tower was up and running.
Industry: Oil and gas
|
|
|
|

|

|
|