Danieli Engineering

Year: 2009
Construction: Hand-laid FRP
Water Flow: 1,250 m³/hr
Danieli Engineering, which specializes in the engineering of industrial plants and acts as a general contractor for turnkey projects, asked for a ten-cell cooling tower for one of its water treatment plants in the Dominican Republic. Specifications were clear: Danieli asked for an FRP cooling tower over a concrete basin with a splash PP fill. Design was according to field conditions and the cooling tower was supplied – as requested.
Industry: Metalworking

 