|
Mekorot Neve Zohar |
|
Year: 2000 Construction: Hand Laid FRP Water Flow: 4,000 m³/hr The water for the Dead Sea hotels comes from the Neve Zohar well. The customer's problem was that the water was coming out hot, and with a high level of sulfide. YWCT provided a set of degasifiers that reduced the level of sulfide in the water and made it suitable for household use. Industry: water utilities |
|
|
.jpg)
| |
|
|
|
|