Ludan Engineering

Year: 2008
Construction: Hand-laid FRP
Water Flow: 120 m³/hr
Ludan Engineering needed a system to cool a Shell-N-Tube heat exchanger as part of a water treatment plant. YWCT provided a complete skid-mounted system that included two packaged cooling towers, redundant pumps, an automatic filter, and a chemical dosing and bleeding system with all piping and gauges required as a plug-N-play system.
Industry: Wastewater and air treatment

 