|
Ludan Engineering |
|
Year: 2008 Construction: Hand-laid FRP Water Flow: 120 m³/hr Ludan Engineering needed a system to cool a Shell-N-Tube heat exchanger as part of a water treatment plant. YWCT provided a complete skid-mounted system that included two packaged cooling towers, redundant pumps, an automatic filter, and a chemical dosing and bleeding system with all piping and gauges required as a plug-N-play system. Industry: Wastewater and air treatment |
|
|
.jpg)
| |
|
|
|
|