A Project's Story

   General Assembly Drawing    Poles of the concrete basin

   Concrete Basin ready for coolin tower erection    Western cell construction completed

   Eastern cell construction assembled outside basin and ready to be placed in its place   Construction of Eastern cell

  Installation of mechanical systems and main water distribution pipes   Installation of ceiling and safety hand rail

  Installation of FRP casing   FRP casing completed

 Installation PVC louvers   Installation of FRP fan stacks

 
  Cooling tower completed and ready for operation  